Construction and executive design for sanitary installations for a project consisting of production-assembly hall with a passage, an office building with break rooms, reception and technical infrastructure for FLEXTRONICS Sp. z o.o., ul. Malinowskiej 28, Tczew.
What we did:
- extension of sanitary and rainfall sewage network
- plumbing and gas connections for the designed production-assembly hall with a passage and an office building with break rooms
- inside water and sewage network
- hydrant installation
- heating installation
- cooling installation
- mechanical ventilation and air conditioning
- gas installation
- gas boiler room technology,
STATUS: COMPLETED