BAKERY MANUFACTURING HALL FOR PIEKARNIA OSKROBA

Complete construction and execution design covering networks and sanitary installations for manufacturing hall with offices and technical and break rooms for a bakery – Piekarnia Oskroba in Człekówka, Kołbiel district.

 

For the building installations we designed:

  • outside water supply network and hydrant network (for technological, domestic and fire fighting system purposes)
  • outside and inside sewage installation (for production and domestic sewage)
  • outside and inside sewage installation for rainwater
  • heating installation, including heated floor of a freezing hall
  • mechanical ventilation installation

 

We have also supervised the tendering process, construction process and turning on of the above mentioned installations, including determining requirements for technical and operating parameters. This project was completed in compliance with technical-construction code and the rules of technical knowledge, professionally and according to the given time schedule. Full size of the investment: 8500 m².

STATUS: COMPLETED

FACTORY AND BAKERY – PIEKARNIA PUTKA
Warszawa

Construction and execution design of manufacturing and office building.

TRAKT KRÓLEWSKI ESTATE
Grójec

A complete sanitary installation in modern domestic buildings.