FACTORY AND BAKERY – PIEKARNIA PUTKA

Manufacturing and office building with car wash of total surface of over 16 000 m².

FACTORY:

What we did: complete construction and execution design covering sanitary networks and installations including.:

  • the design of low pressure steam boiler room
  • the design of mechanical ventilation for the whole plant and basket and car wash
  • the design of gas baking oven and technological equipment
  • the design of water supply network – for technological, domestic and fire fighting purposes
  • the design for domestic and technological sewage system
STATUS: COMPLETED

 

BAKERY:

What we did: The design for heat recovery system for baking ovens and technological steam, which provides heat for technological and domestic purposes, the car wash and the heating of the building. Processing system takes the energy from waste heat sources, such as baking ovens exhausts, collecting the energy in water tanks taking into account time lapse from the moment of energy production to the moment of the demand.

   

SATUS: COMPLETED
 

 

 

LAMBORGHINI/BENTLEY CAR SHOW
Warszawa

Complex construction and executive design for sanitary networks and installations.

SCHOOL COMPLEX
Bielicha/ gm. Zakrzew

Design documentation of sanitary networking in primary school and preschool.

BAKERY MANUFACTURING HALL FOR PIEKARNIA OSKROBA
Człekówka gm. Kołbiel

Complete construction and execution design for manufacturing hall.